It's Thursday so I guess I missed a mid-week post but I got to fire up the lasers today after a long, exhausting start. With the 300mm lens I was able to get cylinder correction to work with some RTIC cups my local coffee shop likes to stick with.
These guys take 5:29 a cup, which is like 3 min faster than my diode AND im using a Lego jig so there is no rotary swap to deal with. With each cup I'm saving almost a whole other cup's worth of time so we are going to be flying!